What does a hand-harvest crew need, and whose duty is it?
Toilets, handwashing and drinking water, and the duty belongs to the employer of the crew under California's own Cal/OSHA scheme, which covers agricultural hand-labor operations including irrigators and labor contractors. No count, ratio or distance from that standard appears on this site. What the rental side provides is units in positions the crew will actually walk to, and a servicing interval that keeps up with the use they get.
The failure mode in an orchard is distance. A cluster parked at the yard gate while the crew works six blocks away stops being used within a day, and the usual fix is more positions rather than more units at one position. Handwashing in particular needs to be beside the toilets rather than back at the yard, because a station nobody passes on the way out is a station nobody uses.
How does the seasonal shape run through the year?
Spring brings the cherry work and the crowd events that go with it. Summer is the hot, dry stretch, where triple-digit afternoons are common and the sensible practice is a position in shade where shade exists, with a trailer and running water considered for a long event. Autumn brings other harvest work across the county. Winter is the quiet half, with light rain, soft ground and heavy valley fog.
That shape is a general pattern rather than a published calendar, and no crop-by-month harvest dates are stated on this page. What follows from it is practical: orchard positions are best agreed before the season rather than during it, and the firm ground a truck will need in February should be identified while it is still dry enough to drive on. Both of those are cheap in advance and expensive on the day.
What should a caller from here have ready?
The parcel or orchard block, how many people and for how long, whether anyone needs an accessible unit, whether there is water on site and which gate a truck should use. US Access Board guidance asks for at least one accessible portable toilet in each cluster at a public event, including a temporary one, while units used only by construction personnel on a construction site are exempt, so the setting determines the answer.
For orchard work, add the crew's movement plan. Crews shift between blocks through a harvest, and a set of agreed positions with a call when the crew moves beats one fixed placement that stops matching reality in week two. For an event, add who approved it and what the county asked for, because the site plan on file is what the restroom layout has to match.