Which rulebook applies to a California jobsite?
California's own. The state runs an occupational safety plan, so jobsite toilets are governed by Cal/OSHA, the Division of Occupational Safety and Health within the Department of Industrial Relations. The federal construction standard is the comparison, not the rule here.
That distinction is worth more than it sounds, because a great deal of construction sanitation advice online is written to the federal standard and then applied to California sites by people who assume the two are interchangeable. A superintendent quoting the federal table to an inspector here is quoting the wrong document, even where the substance happens to line up.
This page prints neither standard's count, and that is deliberate rather than coy: a ratio repeated without its surrounding conditions is the kind of thing that gets a site into difficulty. The division publishes its own material at dir.ca.gov, and a contractor who reads the state standard directly gets the conditions along with the numbers.
Whose duty is it when several subcontractors are on site?
Provision is an employer duty, so it attaches to whoever employs the crew working. On a multi-trade site the practical answer is that the general contractor arranges it for everyone, but that has to be agreed rather than assumed.
A rental arrangement supplies and services the hardware. It does not transfer the obligation, and nothing a technician signs changes who is answerable for the crews present. Where the arrangement has never been written down, the trades that arrive later tend to assume the provision is somebody else's problem, which is how a framing crew ends up with a unit the drywall trades cannot reach.
The sensible version is one order covering the site, placed by whoever controls it, with a named contact for service problems and relocations. That contact is the person a technician calls when a gate is locked, and the person who says when the work face has moved far enough to warrant a move.
Where does a unit stand on a site that keeps changing?
Near the active face but served off the haul road, and out of the path of plant, lifting and grading. A stand that is right for the excavation phase is usually wrong by the time framing starts.
On the big flat sites in Lathrop, Manteca and north Stockton the ground is rarely the obstacle; the movement of the work is. Planning for two or three relocations across a build is more honest than placing a unit optimistically in the middle and hoping the crew tolerates the walk. Each move is scheduled, the tank is managed, and the stand is re-levelled on arrival.
On freshly graded fill and basin soil the other half of the problem appears, which is settlement. A loaded cabin concentrates its weight on four small skids and will lean if the fill is soft or watered, and a leaning cabin is the one the crew stops using. Boarding under the skids, and a stand off the regularly trafficked ground, deal with most of it.
Do jobsite units have to be accessible?
US Access Board guidance states that units used only by construction personnel on a construction site fall outside the accessibility requirements. The condition doing the work is "only by construction personnel", so a site with any public-facing use is not the simple case.
Read the exemption narrowly rather than broadly. A fenced compound where the cabins are used by the working crew is the case the guidance describes. A site where cabins are reachable from a public walkway, where visitors or community events come onto the ground, or where part of the site is open to the public is a different question and accessible provision belongs there.
It is also worth separating the accessibility question from the usability one. A cabin on a slumped patch of fill is a problem for every member of the crew, exempt or not. The accessible restroom page sets out what the guidance asks for where it does apply.
What moves the cost of a jobsite order up or down?
The number of units, how long they stand, how often they are serviced, whether washing is paired, how many relocations the build needs, and how hard the access is. No figure appears on this site; the price is explained and agreed before anything is delivered.
Duration and cadence do most of it, because they repeat. A long build with a crew peak in the middle will not want a single flat interval across its whole run, and saying so in advance is cheaper than discovering it in the hot months. Dust is the local complication: a dry summer site wears an interior faster than the headcount alone suggests.
Access and relocations are the rest. A unit beside a haul road on a large pad is straightforward; one inside a gated compound needing somebody to open up, or one that moves three times along a levee reach, is more work. Describe the phases on the call and the quote will reflect the job rather than a line item.